City of Austin

City of Austin Walnut Creek WWTP – Power Distribution System Improvement Project Phase II

RLC revamped the Aeration Blower Controls, sensing devices, control panels and Settled Water Pump Station.  RLC was responsible for making modifications and additions to the PLC Control System on Sub Station 2.  We have removed hundreds of instruments and have furnished, installed, configured and started up over 60 Pressure Transmitters, 35 Temperature Transmitters, 30 Level Transmitters and 15 Flow Transmitters.  RLC also made additions to the Fiber Optic, Backbone and Network Systems.